TG53B
Page 1 of 2
LBCD Static and Dynamic Tests
Testing Procedures
LBCD Static Tests
(Dynamic Tests on Page 2)
Before testing unit:
Remove all cables from top terminals and control har-
ness from side of unit.
TABLE 1 Pin-to-Pin Tests (See Figures 1 and 2)
METER (+) LEAD
CONNECTION
EXPECTED READING
Diode Test
Diode Test
Diode Test
Diode Test
Diode Test
Diode Test
Ohms Ω
Ohms Ω
Ohms Ω
METER (–) LEAD
CONNECTION
TESTED CIRCUIT
24 V LOAD terminal
24 V BATTERY terminal
12 V LOAD terminal
12 V BATTERY terminal
Socket A*
Socket B*
Socket A*
Socket A*
Socket A*
24 V BATTERY terminal
24 V LOAD terminal
12 V BATTERY terminal
12 V LOAD terminal
Socket B*
Socket A*
Socket C*
Socket D*
Socket E*
24 V battery circuit
24 V battery circuit
12 V battery circuit
12 V battery circuit
internal circuit
internal circuit
internal circuit
internal circuit
internal circuit
OL (blocking)
.3-.7 V (ow)
OL (blocking)
.3-.7 V (ow)
.3-.7 V (ow)
OL (blocking)
>25 K ohms
300-350 ohms
>25 K ohms
Control harness
receptacle
12 V Battery
24 V Load
12 V Load
24 V Battery
Figure 1 – N2003 Load & Battery Control Device Figure 2 – N2003 Control Harness Receptacle
* Socket in LBCD control harness receptacle
Static tests may not diagnose all
LBCD failures. Dynamic testing
should also be performed. See
Page 2.
NOTICE
Pin
Function
TABLE 2 – N2003 Harness Plug
Pin Functions
A
B
C
D
E
Battery Ground
Chg. System Indicator Ground Signal
Battery Disconnect Ground Signal
AC In from Regulator AC Terminal
Battery Voltage Sense/Trickle Charge
METER SCALE
& SYMBOL
Vue de la page 0
1 2

Résumé du contenu

Page 1 - LBCD Static Tests

TG53BPage 1 of 2LBCD Static and Dynamic TestsTesting ProceduresLBCD Static Tests (Dynamic Tests on Page 2)Before testing unit:Remove all cables from t

Page 2 - LBCD DYNAMIC Tests

TG53BPage 2 of 2C. E. Niehoff & Co. • 2021 Lee Street • Evanston, IL 60202 Tech Servi